
| CTL HOMEPAGE | ABOUT THE CTL | DECISION SHEETS | TESTING LABS |
| TESTING EQUIPMENT | PROFICIENCY TESTING | ETFs AND WORKING GROUPS | OPERATIONAL PROCEDURES |
Back to Operational Procedures and other useful documents
Operational Procedures
| Reference | Date | Description | File(s) |
|---|---|---|---|
| CTL-OP 100 | 2010-04-06 | Index of the CTL Operational Procedures | ![]() |
| CTL-OP 101 | 2009-10-20 | CTL decisions of current interest | ![]() |
| CTL-OP 102 | 2001-11-28 | Numbering of IECEE-CTL documents | ![]() |
| CTL-OP 103 | 2007-11-14 | Rules of Operation for CTL Profeciency Test Program | ![]() |
| CTL-OP 104 | Withdrawn | List of Testing Laboratories (CBTLs) entitled to attend CTL meetings | List |
| CTL-OP 105 | 2010-07-07 | Application for CTL/ETF or WG Member |
|
| CTL-OP 106 | 2010-07-07 | Procedures and rules for CTL "Task Forces" |
|
| CTL-OP 107 | 2010-07-07 | Guide of use of photographs CB Test Reports | ![]() |
| CTL-OP 108 | 2004-03-08 | Laboratory procedure for preparation, attachment, extension and use of thermocouples | ![]() |
| CTL-OP 109 | 2010-07-07 | Laboratory procedure for acceptance of thermocouple wire | |
| CTL-OP 110 | 2010-07-07 | Procedure for measuring laboratory power source characteristic | ![]() |
| CTL-OP 111 | 2007-07-19 | Requirements for traceability of calibrations and calibration intervals | ![]() |
| CTL-OP 112 | 2010-07-07 | Preparation of CTL lists for “Testing and measuring equipment/ allowed subcontracting“ (short: equipment lists) |
|